Permissions with status
Retain the values of the permission trace to the role menu
The background to the mass presence of authorization objects in a PFCG role after a role menu has been created is usually the mass of generic OP links that are not actually necessary for the CRMBusiness role. The existence of proposed values from the transaction SU24 loads the proposed authorisation values associated with the respective external services into the PFCG role, which results in too many unnecessary authorization objects being placed there. By excluding the GENERIC_OP_LINKS folder, you only need to take care of the external services and their authorization objects configured in the CRM business role in your PFCG role. For a user to have all the necessary permissions, you now assign the basic role with the permissions to the generic operating links and the actual role that describes the user's desktop.
Careful preparation is a prerequisite for a successful authorisation check. A functional specification must be created for all customer-specific functionalities. This forces us to think about what the actual requirements of the application are and then describe the possible implementation. In doing so, security-related aspects, such as eligibility testing and allocation, must be taken into account. Define what you can do with this programme and also what you cannot do explicitly! In the case of a permission check, not only the activity to be performed, such as reading, changing, creating, etc. , can be checked. You can also restrict access to records by using specific criteria, such as field content or organisational separators.
Add external services from SAP CRM to the proposal values
Suitable for this responsible task are, for example, department heads or SAP key users who are familiar with all data access options (cross-module, via report, directly to the raw table, etc.) as well as with the organizational and technical protection measures. By signing the data ownership concept, the responsibility should be acknowledged and taken as seriously and bindingly as, for example, the signature under the purchase contract of a house.
If these issues are not taken into account during a conversion, there will be an imbalance between the system and the components to be protected, since the change in the system constellation means that new components, such as those mentioned above, must also be taken into account. Otherwise, a company may suffer economic damage and the resulting damage to its image. Furthermore, neglect of legal requirements (BDSG, DSGVO, GOB, HGB, etc.)1 can lead to legal measures or steps.
With "Shortcut for SAP systems" you can automate the assignment of roles after a go-live.
The website www.sap-corner.de offers many useful information about SAP basis.
However, they will lead to greater transparency and security.
So much information... how can you keep it so that you can find it again when you need it? That's what Scribble Papers is great for.
You have read that it is possible to perform mass activities, such as mass roll-offs, using standard means.